Skip to content
Zeepad Group
  • Home
  • News
  • Contact
  • About
    • Signage Production
    • Steel Fabrication
    • Award Manufacturing
    • Billboard Construction
    • Aluminum Cladding
    • LED Screen Outdoor Advertising
    • Drainage System
    • Building and civil engineering
  • Career
  • Management
  • Indoor Outdoor Led Screen 2022 Hot
  • LED Outdoor Advertising Screen

Home » Archives for January 30, 2022

Day: January 30, 2022

Building and Civil engineering

Day 34th of Cway group Drainage construction and execution, in Ibadan Nigeria.

Posted on January 30, 2022
drainage channel system Custom outdoor brass linear drains drainage system

Day 34th of Cway group Drainage construction and execution, in Ibadan Nigeria. Concrete used in drainage systems typically takes 24 to 48 hours to dry enough for you to walk or drive on it. However, concrete drying is a continuous and fluid event and usually reaches its full effective strength after about 28 days. And […]

Recent Posts

  • P1.8 Poster Shopping Mall Indoor Poster Led Display Screen
  • P2.5 P2 P1.8 Poster Commercial Shopping Mall Indoor Poster Led Display Screen
  • Petrol station signpost production companies in Abuja Nigeria Africa.
  • LED Screen Cabinet factory in Abuja Nigeria 🇳🇬
  • Where to buy Cabinet for LED screen protector in Abuja Nigeria.

Filling station signage nigeria

Cladding Supply and Installation

Billboard construction in Lagos Nigeria

Latest Updates ☀

  • P1.8 Poster Shopping Mall Indoor Poster Led Display Screen June 30, 2022
  • P2.5 P2 P1.8 Poster Commercial Shopping Mall Indoor Poster Led Display Screen June 29, 2022

Season Greetings

January 2022
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Dec   Feb »

What are you looking for

Categories

LED Billboard Frame Installation

https://zeepadgroup.com/wp-content/uploads/2020/12/LED-screen-billboard-frame.mp4

Designed by Echenou Micheal

Proudly powered by WordPress | Theme: Sydney by aThemes | Designed by Echenou Micheal.